| Release Date: | 2026-06-24 | |
| Impact: | Moderate | What is this? |
In the Linux kernel, the following vulnerability has been resolved: net/sched: taprio: fix use-after-free in advance_sched() on schedule switch In advance_sched(), when should_change_schedules() returns true, switch_schedules() is called to promote the admin schedule to oper. switch_schedules() queues the old oper schedule for RCU freeing via call_rcu(), but 'next' still points into an entry of the old oper schedule. The subsequent 'next->end_time = end_time' and rcu_assign_pointer(q->current_entry, next) are use-after-free. Fix this by selecting 'next' from the new oper schedule immediately after switch_schedules(), and using its pre-calculated end_time. setup_first_end_time() sets the first entry's end_time to base_time + interval when the schedule is installed, so the value is already correct. The deleted 'end_time = sched_base_time(admin)' assignment was also harmful independently: it would overwrite the new first entry's pre-calculated end_time with just base_time.
See more information about CVE-2026-53011 from MITRE CVE dictionary and NIST NVD
NOTE: The following CVSS metrics and score provided are preliminary and subject to review.
| Base Score: | 7.0 |
| Vector String: | CVSS:3.1/AV:L/AC:H/PR:L/UI:N/S:U/C:H/I:H/A:H |
| Version: | 3.1 |
| Attack Vector: | Local |
| Attack Complexity: | High |
| Privileges Required: | Low |
| User Interaction: | None |
| Scope: | Unchanged |
| Confidentiality Impact: | High |
| Integrity Impact: | High |
| Availability Impact: | High |
| Platform | Errata | Release Date |
| Oracle Linux version 8 (kernel-uek) | ELBA-2026-500163 | 2026-08-11 |
| Oracle Linux version 9 (kernel-uek) | ELBA-2026-500163 | 2026-08-11 |
This page is generated automatically and has not been checked for errors or omissions. For clarification or corrections: